浅谈燃气项目成本超额的分析及控制方法
引用本文:邵杰.浅谈燃气项目成本超额的分析及控制方法[J].上海煤气,2007(4):38-41.
作者姓名:邵杰
作者单位:上海煤气第一管线工程有限公司
摘    要:在燃气工程施工中,经常会发生最终费用超过最初(计划)费用,本文通过阐述对燃气施工工程中的人、材、机三大要素的分析控制,来提高工程施工管理水平,使超额成本处于合理受控状态,从而提高企业的经营运行能力。

关 键 词:成本  超额  分析  控制
修稿时间:2007-05-14

Briefly Discuss about Analysis and Control Methods of Gas Project Extra Cost
Shao Jie.Briefly Discuss about Analysis and Control Methods of Gas Project Extra Cost[J].Shanghai Gas,2007(4):38-41.
Authors:Shao Jie
Affiliation:Shanghai No. 1 Gas Pipeline Engineering Co., Ltd.
Abstract:During gas project construction, the phenomenon is usual that the final cost will be much more than initial plan. The article expands the three mains parts of analysis and control methods during gas project construction, human, materials, and machines, which improves the project management level and makes extra cost under control in order to improve enterprise management operating capabilities.
Keywords:cost extra cost analysis control