秦山CANDU核电厂大修周期延长的初步研究
引用本文:姜福明,王德忠.秦山CANDU核电厂大修周期延长的初步研究[J].核动力工程,2009,30(4).
作者姓名:姜福明  王德忠
作者单位:1. 上海交通大学,上海,200240;中国核工业集团公司,北京,100822
2. 上海交通大学,上海,200240
摘    要:重水堆核电厂因其具有不停堆换料的优势,不受燃料燃耗的限制,可安排较长的大修周期.通过大修周期的延长,可以减少电站寿期内计划大修的次数,减少机组停堆和启动的次数,有效提升机组寿期内容量因子、机组大修业绩和运行业绩.本文结合秦山CANDU核电厂和国外重水堆核电厂情况,提出大修周期延长的初步可行性分析和实施建议.

关 键 词:CANDU核电厂  大修周期  延长

Preliminary Study on Outage Cycle Extension of Qinshan CANDU NPP
JIANG Fu-ming,WANG De-zhong.Preliminary Study on Outage Cycle Extension of Qinshan CANDU NPP[J].Nuclear Power Engineering,2009,30(4).
Authors:JIANG Fu-ming  WANG De-zhong
Affiliation:1. Shanghai Jiaotong University;Shanghai;200240;China;2. China National Nuclear Corporation;Beijing;100822;China
Abstract:Currently, most NPP operators have attached great importance to the optimization of outage duration. By taking various optimization measures, the operators have managed to optimize the outage duration and improve the operational performance. CANDU NPP, with its unique feature of on-power refueling and less constraint from fuel burn-up, offers the opportunity of longer outage cycle. With the extension of outage cycle, it is possible to reduce the number of outages in the life time of NPP, minimize the number...
Keywords:CANDU NPP  Outage cycle  Extension  