人工挖孔灌注桩桩底打管后注浆技术及应用
引用本文:段新胜 鄢泰宁 顾湘. 人工挖孔灌注桩桩底打管后注浆技术及应用[J]. 探矿工程(岩土钻掘工程), 2001, 0(5): 1-3
作者姓名:段新胜 鄢泰宁 顾湘
作者单位:1. 中国地质大学汉口分校岩土与建筑工程系,湖北武汉 430030
2. 中国地质大学〈武汉〉工程学院,湖北武汉 430074
摘    要:结合实际工程介绍了人工挖孔灌注桩桩底打管后注浆的设计与施工新方法,使用该方法不仅可避免在含承压水的砂土层中进行人工扩底施工且可提高单桩承载力.

关 键 词:人工挖孔灌注桩  桩底打管  后注浆
文章编号:1000-3746(2001)05-0001-03
修稿时间:2001-02-21

Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
DUAN Xin sheng,GU Xiang. Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2001, 0(5): 1-3
Authors:DUAN Xin sheng  GU Xiang
Abstract:The design and construction method of hand dug piles with post grouting by the driven tube at the pile end is introduced with reference to the field cases. Not only does it eliminate the manual underreaming process in the sand layer with pressure bearing water, but also increase the single pile bearing capacity.
Keywords:hand dug pile  tube driving at the pile end  post grouting  