首页 | 本学科首页   官方微博 | 高级检索  
     


Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
Authors:Xiaopan Zhang  Xiaohui Yuan  Yanbin Yuan
Affiliation:

aInstitute of System Engineering, Huazhong University of Science and Technology, Wuhan, 430074, China

bSchool of Hydropower & Information Engineering, Huazhong University of Science and Technology, Wuhan, 430074, China

cSchool of Resources & Environmental Engineering, Wuhan University of Technology, Wuhan, 430070, China

Abstract:The purpose of this paper is to deal with the optimal navigation co-scheduling (NCS) for the two dams of the Three Gorges Project in China, i.e., the Three Gorges Dam and the Gezhouba Dam. The co-scheduling includes the operational scheduling for all five locks of the two dams, and the dispatching scheduling to ships applying to pass the dams. Compared with the flexible manufacturing system (FMS), a mixed-integer nonlinear programming model is designed for the NCS, and an improved hybrid algorithm of simulated annealing and local search is addressed to obtain optimal scheduling. Experiments based on real historical execution data show that the approach is feasible.
Keywords:Simulated annealing  Local search  Mixed-integer nonlinear programming  Optimal navigation co-scheduling  Three gorges project
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号