首页 | 本学科首页   官方微博 | 高级检索  
     

发挥自备热电厂现有设备出力 增设6MW纯凝机组的技术可行性分析
引用本文:汤永平.发挥自备热电厂现有设备出力 增设6MW纯凝机组的技术可行性分析[J].中国氯碱,2012(6):43-46.
作者姓名:汤永平
作者单位:贵州开磷遵义碱厂,贵州遵义,563004
摘    要:从锅炉的出力、汽轮机的耗汽量、外供汽量,循环水量的配置上论述了增加6 MW纯凝机组的技术可行性。

关 键 词:现有设备  6MW纯凝机组  可行性

Technology feasibility analysis of addition of 6MW pure condensing turbine to play existing capacity of thermal power plant
TANG Yong-ping.Technology feasibility analysis of addition of 6MW pure condensing turbine to play existing capacity of thermal power plant[J].China Chlor-Alkali,2012(6):43-46.
Authors:TANG Yong-ping
Affiliation:TA NG Yong-ping (Guizhou Kailin Zunyi soda plant,563004 Zunyi ,China)
Abstract:To contribute to the article from the boiler, steam turbine steam consumption and external supply of steam, circular discusses the allocation of water to increase the feasibility of 6MW of pure condensate unit.
Keywords:existing equipment  6 MW condensing units  feasibility
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号