首页 | 本学科首页   官方微博 | 高级检索  
     

盾构施工中的沉降监测
引用本文:杜冰冰.盾构施工中的沉降监测[J].工程建设与设计,2007(5):72-77.
作者姓名:杜冰冰
作者单位:中铁十九局集团第五工程有限公司,辽宁,大连,116100
摘    要:地铁施工由于在建筑物稠密、地下管网繁多的城市环境中建设,不仅工程测量精度要求高,而且技术密集、造价昂贵,地面沉降观测尤为重要.针对地铁施工中沉降监测主要任务及基本方法进行了总结,对盾构施工中的地面沉降监测的方法和数据分析有一定的指导意义.

关 键 词:盾构施工  沉降  监测
文章编号:1007-9467(2007)05-0072-06
修稿时间:2007-02-02

Settlement Supervising in TBM Construction
DU Bing-bing.Settlement Supervising in TBM Construction[J].Construction & Design for Project,2007(5):72-77.
Authors:DU Bing-bing
Affiliation:The 5^th engineering Co., Ltd. of China railway 19 Bureau group Corporation, Dalian 116100, China
Abstract:The subway construction is carried out in the city circumstance of dense buildings and various underground pipe net, so measuring accuracy must meet the high requirements, many technical jobs must be executed and the cost of the project shall be expensive. Settlement supervising of surface shows its importance in the process of construction. This article sums up the main tasks and basic methods of settlement supervising aimed at subway construction, provides direction signification to supervising methods of surface settlement and data analysis in TBM construction.
Keywords:TBM(Tunnel boring Machine) Construction  settlement  supervising
本文献已被 CNKI 维普 万方数据 等数据库收录!