首页 | 本学科首页   官方微博 | 高级检索  
     

山区张力架线施工存在主要问题及解决方式
引用本文:余自强.山区张力架线施工存在主要问题及解决方式[J].山西电力,2012(2):70-72.
作者姓名:余自强
作者单位:江西省送变电建设公司,江西南昌,330200
摘    要:以某瀑布沟—东坡东线500 kV双回线路工程为例,阐述了其地处大渡河旁,塔基高差较大,转角塔占全工程塔型的一半,针对放线过程中上扬塔多,在施工过程中采取了各种处理措施,保证了架线工程的顺利进行。

关 键 词:张力架线  导线上扬  线路施工

Problems and Solutions of Tension Stringing Construction in Mountainous Area
YU Zi-qiang.Problems and Solutions of Tension Stringing Construction in Mountainous Area[J].Shanxi Electric Power,2012(2):70-72.
Authors:YU Zi-qiang
Affiliation:YU Zi-qiang(Jiangxi Transmission &Transformation Company,Nanchang,Jiangxi 330200,China)
Abstract:Pubugou-Dongpo 500 kV double-circuit transmission line is located near the base of Dadu River with large height difference of tower foundation.The angle towers occupy half of the towers to be constructed.Since many of the towers tend to be constructed on upslope,various measures are adopted to ensure the construction smoothly.
Keywords:tension stringing  conductor on upslope  transmission line construction