糯扎渡水电站泄洪洞底拱混凝土滑模施工技术
引用本文:张尹耀,李文瑛,宋希宁.糯扎渡水电站泄洪洞底拱混凝土滑模施工技术[J].水力发电,2011,37(7):47-49.
作者姓名:张尹耀  李文瑛  宋希宁
作者单位:中国人民武装警察部队水电第一总队第一支队,河北唐山,063004
摘    要:糯扎渡水电站右岸泄洪洞有压段圆形底拱混凝土浇筑采用滑模施工技术.施工中遵循规范要求,按施工方案和质量标准严格管控,在保证质量的前提下,大大缩短了工期,为边顶拱台车浇筑创造了有利条件,取得了良好的经济效益和社会效益.

关 键 词:泄洪洞  底拱  滑模  糯扎渡水电站

Concrete Slipform Construction for the Invert of Spillway Tunnel in Nuozhadu Hydropower Station
Zhang Yinyao,Li Wenying,Song Xining.Concrete Slipform Construction for the Invert of Spillway Tunnel in Nuozhadu Hydropower Station[J].Water Power,2011,37(7):47-49.
Authors:Zhang Yinyao  Li Wenying  Song Xining
Affiliation:Zhang Yinyao,Li Wenying,Song Xining(The 1st Detachment of 1st General Contingent of Chinese People's Armed Police Hydropower Troops,Tangshan 063004,Hebei,China)
Abstract:The concrete in the invert of circular pressured sections of the spillway tunnel in Nuozhadu Hydropower Station was placed by using slipform.Following the requirements of construction specifications and managing strictly the construction according to construction program and quality standards,the construction period is shorten on the basis of guarantying the quality.The construction also provides a good basis for the concrete placement of other parts of tunnel,and achieves good economic and social benefits.
Keywords:spillway tunnel  invert  slipform  Nuozhadu Hydropower Station  