摘    要:内蒙古呼和浩特抽水蓄能电站2号路执勤岗亭10 kV配电线路所处地理位置较为复杂,施工难度大.针对于此,对线路架设方案进行了对比选择,并阐述了具体的施工技术要求和过程控制.

关 键 词:配电线路  架设  拉线  线杆  抽水蓄能电站

10 kV Line Erection for Hohhot Pumped-storage Power Station
Liu Qiang,Tian Sujie. 10 kV Line Erection for Hohhot Pumped-storage Power Station[J]. Water Power, 2011, 37(7): 59-60
Authors:Liu Qiang  Tian Sujie
Affiliation:Liu Qiang,Tian Sujie(The 1st Detachment of 1st General Contingent of Chinese People's Armed Police Hydropower Troops,Tangshan 063004,Hebei,China)
Abstract:The erection of 10 kV distribution line for supplying power to the sentry box in the Second Road of Hohhot Pumped-storage Power Station is difficult as the more complicated environment.The erection program is compared and selected,and the construction technology requirements and process control are also introduced herein.
Keywords:power distribution line  erection  cable  pole  pumped-storage power station  