南水北调南干渠工程穿越风险地段的施工方法
引用本文:王进平,胡文利.南水北调南干渠工程穿越风险地段的施工方法[J].水力发电,2011,37(7).
作者姓名:王进平  胡文利
作者单位:中国人民武装警察部队水电第一总队第一支队,河北唐山,063004
摘    要:南水北调南干渠Ⅲ标需要全段穿越大兴灌渠、桥墩、垃圾坑以及二元地质结构地层等风险地段,施工难度大.施工中采取了铺设土工膜、现浇混凝土方涵导流、加密钢格栅等方法,安全地穿越了风险地段.

关 键 词:浅埋暗挖法  施工  风险地段  南水北调南干渠工程

Construction of South Main Canal Sections Crossing Risk Sites in South-to-North Water Diversion
Wang Jinping,Hu Wenli.Construction of South Main Canal Sections Crossing Risk Sites in South-to-North Water Diversion[J].Water Power,2011,37(7).
Authors:Wang Jinping  Hu Wenli
Affiliation:Wang Jinping,Hu Wenli(The 1st Detachment of 1st General Contingent of Chinese People's Armed Police Hydropower Troops,Tangshan 063004,Hebei,China)
Abstract:The third tender section of South Main Canal in South-to-North Water Diversion will cross risk sites of Daxing irrigation channel,bridge piers,waste pits and the stratum with binary geological structure,and the construction is difficult.By laying geomembrane,diverting flood with on-site pouring concrete square culvert and increasing the number of steel grilles,the construction is safely completed.
Keywords:shallow tunneling method  construction  risk site  South Main Canal Project of South-to-North Water Diversion  