首页 | 本学科首页   官方微博 | 高级检索  
     

异常高温胍胶压裂液体系研制与应用
引用本文:郭建春,辛军,王世彬,赵金洲.异常高温胍胶压裂液体系研制与应用[J].石油钻采工艺,2010,32(3):64-67.
作者姓名:郭建春  辛军  王世彬  赵金洲
作者单位:1.西南石油大学油气藏地质及开发工程国家重点实验室,四川成都 610500
摘    要:目前国内常规的压裂液体系仅适用温度150℃以下的地层。室内对影响超高温压裂液性能的主要添加剂——稠化剂和交联剂进行了改性,通过严格控制反应条件,得到低残渣、高黏度的超高温胍胶稠化剂GHPG和超高温延迟交联剂BA1-21,研制出耐温190℃以上的超高温压裂液体系。对超高温改性胍胶的性能进行了评价,对超高温压裂液体系交联剂延迟交联性能、耐温耐剪切性能进行了评价。在ZG63井实施压裂改造8d后,压裂液返排率74.9%,平均产气6000m3/d,初步达到了改造储层并认识储层的效果。该技术对国内深层超高温储层压裂具有一定指导意义。

关 键 词:超高温压裂液    稠化剂改性    交联剂改性    190      现场实施
收稿时间:2019-03-30

Research and application of gum/borate gelling fracturing fluid system for abnormal high temperature use
GUO Jianchun,XIN Jun,WANG Shibin,ZHAO Jinzhou.Research and application of gum/borate gelling fracturing fluid system for abnormal high temperature use[J].Oil Drilling & Production Technology,2010,32(3):64-67.
Authors:GUO Jianchun  XIN Jun  WANG Shibin  ZHAO Jinzhou
Affiliation:1.State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu 610500, China
Abstract:Proper fracturing fluid system is critical to successful deep well (more than 5000m deep) fracturing with abnormal high temperature (higher than 180 ℃). However, conventional fracturing fluid systems now used in China only adapt to the strata with temperature lower than 150 ℃. Lab experiment is conducted to modify two major additives that affect the property of ultra-high temperature fracturing fluid---thickener and crosslinker. By strictly controlling the reaction conditions, GHPG gum/borate gelling thickner with low residue and high viscosity for ultra-high temperature use and BA1-21 delayed crosslinker for ultra-high temperature use are obtained, and a fracturing fluid system resistant to the temperature higher than 190 ℃ is developed successfully. The performance of modified gum/borate gell for ultra-high temperature use is evaluated, the delayed crosslinking performance and heat/shearing resistance of crosslinker of the fracturing fluid system for ultra-high temperature use is also evaluated. Eight days after fracturing and modification in ZG63 well, flow back rate of fracturing fluid attains to 74.9%, with the average being 6000 m3. The reservoir is modified and recognized. This new breakthrough is valuable for deep reservoir fracturing with ultra-high temperature in China.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《石油钻采工艺》浏览原始摘要信息
点击此处可从《石油钻采工艺》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号