首页 | 本学科首页   官方微博 | 高级检索  
     

复合板锻焊过渡段焦炭塔制造
引用本文:朱海兴.复合板锻焊过渡段焦炭塔制造[J].压力容器,2006,23(1):23-28.
作者姓名:朱海兴
作者单位:中国石化集团宁波工程有限公司,浙江,宁波,315207
摘    要:介绍了某新建150万吨/年延迟焦化装置焦炭塔的制造。在总结以往大量焦炭塔制造经验的基础上,针对设备结构和复合板材质特点并结合现场具体条件,制订了合理的焊接工艺、热处理工艺,并开发和应用了横向埋弧自动焊工艺,取得了良好的综合效果。

关 键 词:焦炭塔  复合板  焊接  热处理
文章编号:1001-4837(2006)01-0023-06
收稿时间:2005-12-29
修稿时间:2005-12-29

Construction of Clad-metal Coke Drum with an Integral Skirt Attachment Stub
ZHU Hai-Xing.Construction of Clad-metal Coke Drum with an Integral Skirt Attachment Stub[J].Pressure Vessel Technology,2006,23(1):23-28.
Authors:ZHU Hai-Xing
Affiliation:Sinopec Ningbo Engineering Co., Ltd., Ningbo 315207 , China
Abstract:This paper introduces coke drum construction of 1.5 Mt/a Delayed Coke Unit. On base of rich experience of coke drum construction, reasonable procedures of welding and heat treatment were prepared against typical structure and clad - metal characteristics. Besides, we successfully developed a new weld process horizontal SAW, and subsequent got a very good comprehensive effect.
Keywords:coke drum  clad - metal  welding  heat treatment  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号