首页 | 本学科首页   官方微博 | 高级检索  
     

24米跨预应力折线型屋架后张法施工工艺
引用本文:鲁华滨. 24米跨预应力折线型屋架后张法施工工艺[J]. 辽东学院学报(自然科学版), 1999, 0(Z1)
作者姓名:鲁华滨
作者单位:丹东市第一建筑工程公司
摘    要:本文阐述了24米跨预应力折线型屋架预应力筋安装张拉及孔道灌浆等施工过程。

关 键 词:张拉  孔道穿筋  张拉力  预应力  锚具  灌浆

24m Span Broken - line Type Roof Trusses Post - Stressed Concrete Construction Technology
Lu Huabin. 24m Span Broken - line Type Roof Trusses Post - Stressed Concrete Construction Technology[J]. Journal of Liaodong University(Natural Sciences), 1999, 0(Z1)
Authors:Lu Huabin
Affiliation:Dandong No.1 Project Company
Abstract:Abstract This essay states that 24m long pre - stressed steel bars are threaded throuth the holes running throughout the concrete roof trusses, secondly stretched on the site, anchored and grout holes filled up construction processes ect.
Keywords:stretching   pre - stressed steel bars installation   stretching force   anchor   grout  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号