首页 | 本学科首页   官方微博 | 高级检索  
     

官地水电站引水发电系统接地网接地电阻测试
引用本文:孙文勇,白锦. 官地水电站引水发电系统接地网接地电阻测试[J]. 黑龙江水利科技, 2012, 0(9): 35-36
作者姓名:孙文勇  白锦
作者单位:中国水利水电第六工程局有限公司
摘    要:良好的接地装置是电网安全稳定运行的重要保证,为了保证电网的正常运行和出现故障时设备以及人身的安全,电气设备应保证良好的接地。而准确地测试接地电阻是否符合设计要求,保证接地装置的良好质量,可以从根本上防止发生电气事故。重点介绍了官地水电站接地网接地电阻的测试。

关 键 词:接地网  接地电阻  测试  测量  水电站

Crown Land Hydro Power Station Grounding Resistance Test
SUN Wen-yong and BAI jin. Crown Land Hydro Power Station Grounding Resistance Test[J]. Heilongjiang Science and Technology of Water Conservancy, 2012, 0(9): 35-36
Authors:SUN Wen-yong and BAI jin
Affiliation:SUN Wen-yong and BAI jin (Water Resources and Hydropower Engineering Bureau Co.,Ltd.,Dandong 118000,Liaoning)
Abstract:The grounding device is an important guarantee of the power grid safe and stable operation,in order to ensure the normal operation of the grid and the failure of equipment and personal safety,electrical equipment should ensure a good ground.Accurate test ground resistance is to meet the design requirements to ensure the good quality of the grounding device,you can fundamentally prevent an electrical accident occurs.Focuses on the Crown Land Hydropower station grounding resistance test.
Keywords:ground network  grounding resistance  test  measurement  hydropower station
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号