首页 | 本学科首页   官方微博 | 高级检索  
     

PTC管桩对路堤的上刺入量估算
引用本文:刘刚.PTC管桩对路堤的上刺入量估算[J].山西建筑,2010,36(27):279-280.
作者姓名:刘刚
作者单位:江苏省中成建设工程总公司,江苏南京,210041
摘    要:探讨了无碎石垫层带帽PTC管桩对路堤的上刺入量估算方法,介绍了基本参数及具体的计算方法,着重阐述了桩土荷载分担计算、路堤破坏形式验算及上刺入量的估算,指出桩帽的存在能显著减小桩顶刺入量,且一定的桩间距存在一个最佳桩帽尺寸。

关 键 词:PTC管桩  路堤  桩土荷载  上刺入量

The estimation of upstroke amount on PTC pipe pile to embankment
LIU Gang.The estimation of upstroke amount on PTC pipe pile to embankment[J].Shanxi Architecture,2010,36(27):279-280.
Authors:LIU Gang
Abstract:This paper discusses the estimation method of upstroke amount on PTC pipe pile with cap which has no gravel mattress to embankment.It introduces the basic parameter and the particular calculation method.It pays more attention to talk about the sharing calculation of pile-earth loading,the checking calculation of embankment failure mode,the estimation of upstroke amount.Indicatting that the existence of pile cap can decrease the upstroke amount of pile head remarkable.There has a optimum dimension of pile cap on determinate space of the pile.
Keywords:PTC pipe pile  embankment  the pile-earth loading  upstroke amount
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号