首页 | 本学科首页   官方微博 | 高级检索  
     

宝钢3号高炉冷却壁更换及效果
引用本文:朱仁良,陶卫忠. 宝钢3号高炉冷却壁更换及效果[J]. 炼铁, 2004, 23(5): 1-5
作者姓名:朱仁良  陶卫忠
作者单位:宝山钢铁股份有限公司;宝山钢铁股份有限公司
摘    要:对宝钢3号高炉冷却壁的现状及炉体冷却的薄弱环节进行了分析,指出了更换S-3段冷却壁的必要性。重点对更换S-3段冷却壁过程中一些主要的高炉操作经验进行了总结,如降料线操作、炉渣调整、休送风控制等,并阐述了更换S-3段冷却壁后高炉炉体冷却实际效果和技术经济指标的改进。

关 键 词:冷却壁  料线  长寿  利用系数
修稿时间:2004-07-17

Replacement of cooling stave at No.3 blast furnace in Baosteel and replacement effect
Zhu Renliang Tao Weizhong. Replacement of cooling stave at No.3 blast furnace in Baosteel and replacement effect[J]. Ironmaking, 2004, 23(5): 1-5
Authors:Zhu Renliang Tao Weizhong
Affiliation:Baoshan Iron and Steel Co. Ltd.
Abstract:This essay analyzes the actual condition of cooling stave at No.3 blast furnace in Baosteel and weak links existing in stack cooling, puts forward the necessity of changing cooling stave at S-3 section. In addition, the main operation experiences obtained in changing cooling stave at S-3 section were concluded, such as operation in lowering stock line, slag regulation, blow off and blow-on control, etc. Finally, the author summarizes the actual effect of blast furnace stack cooling after changing cooling stave at S-3 section and improvement of techno-economic indexs.
Keywords:cooling stave stock line long campaign productivity
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号