海工超大型混凝土箱梁浇筑工艺
引用本文:汪铁钧,刘阳,沈枫. 海工超大型混凝土箱梁浇筑工艺[J]. 中国市政工程, 2006, 0(2): 25-27
作者姓名:汪铁钧  刘阳  沈枫
作者单位:上海市第二市政工程有限公司,上海,200061
摘    要:东海大桥Ⅱ标段为60m超大型混凝土连续梁桥。在研究高性能海工混凝土的施工性能的基础上,分析了箱梁混凝土浇筑关键点、设备配置和浇筑时间控制等。成功地制订优化工艺并予以实施。

关 键 词:高性能海工混凝土  超大型箱梁  浇筑工艺
文章编号:1004-4655(2006)02-0025-03
收稿时间:2005-12-08
修稿时间:2005-12-08

Casting Technique of Maritime Works Super Size Concrete Box Girder
WANG Tie-jun,LIU Yang,SHEN Feng. Casting Technique of Maritime Works Super Size Concrete Box Girder[J]. China Municipal Engineering, 2006, 0(2): 25-27
Authors:WANG Tie-jun  LIU Yang  SHEN Feng
Abstract:Donghai Bridge (II bidding section) is 60 meters long, super size concrete continuous girder bridge. The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete. And the optimization technique is set down and carried out successfully.
Keywords:high quality maritime works concrete  super size box girder  casting technique