首页 | 本学科首页   官方微博 | 高级检索  
     

地铁车辆段上盖建筑道砟垫减振机理与效果
引用本文:曹志刚,王思崎,许逸飞,白晓东,袁宗浩,马夏飞. 地铁车辆段上盖建筑道砟垫减振机理与效果[J]. 浙江大学学报(工学版), 2023, 57(1): 71-80. DOI: 10.3785/j.issn.1008-973X.2023.01.008
作者姓名:曹志刚  王思崎  许逸飞  白晓东  袁宗浩  马夏飞
作者单位:1. 浙江大学 滨海和城市岩土工程研究中心,浙江 杭州 3100582. 浙江工业大学 岩土工程研究所,浙江 杭州 3100233. 杭州市东胜置业有限公司,浙江 杭州 310020
基金项目:国家自然科学基金资助项目(51778571, 51978611);浙江省杰出青年基金资助项目(LR21E080004)
摘    要:为了分析道砟垫对上盖建筑的减振效果,对杭州市某地铁车辆段咽喉区、试车线碎石道床(含道砟垫)轨道和上盖建筑振动响应进行现场测试.考虑桩与土体的相互作用,建立列车-轨道-土体-桩-上盖建筑三维全耦合动力学模型,揭示了车辆段列车引起上盖建筑振动传播的规律以及道砟垫对上盖建筑减振的机理,分析不同车速下道砟垫刚度对减振效果的影响.结果发现,上盖建筑底层振动主频为40~80 Hz,高频成分随着层高衰减明显;建筑顶层振动主频为20~40 Hz,低频成分随着层高有增大的趋势.道砟垫对上盖建筑的减振效果随着频率的增大呈整体改善的趋势,40 Hz以上的频段,结构最大插入损失可达7~12 dB.车速越高,道砟垫刚度越小,道砟垫对上盖建筑的减振效果越好.综合考虑道砟垫压缩量和减振效果,建议道砟垫刚度取值为0.012~0.024 N/mm3.

关 键 词:地铁车辆段  道砟垫  上盖建筑物  减振效果

Vibration mitigation mechanism and effect of ballast mats for over-track buildings on metro depot
Zhi-gang CAO,Si-qi WANG,Yi-fei XU,Xiao-dong BAI,Zong-hao YUAN,Xia-fei MA. Vibration mitigation mechanism and effect of ballast mats for over-track buildings on metro depot[J]. Journal of Zhejiang University(Engineering Science), 2023, 57(1): 71-80. DOI: 10.3785/j.issn.1008-973X.2023.01.008
Authors:Zhi-gang CAO  Si-qi WANG  Yi-fei XU  Xiao-dong BAI  Zong-hao YUAN  Xia-fei MA
Abstract:The vibration responses of track structures in the throat area and test line (with ballast mats) and those of over-track buildings at Hangzhou metro depot were tested in order to analyze the vibration mitigation effect of ballast mats on over-track buildings. A three-dimensional fully-coupled dynamic model of train-track-soil-pile-building was established by considering the interaction between pile and soil. The model revealed the vibration propagation laws of over-track buildings caused by train in the metro deport and the mitigation mechanism of ballast mats on over-track buildings. The influence of stiffness of ballast mats on vibration mitigation effect under different train speeds was analyzed. Results showed that the main frequency range of ground floor vibration was 40-80 Hz, and the high frequency component obviously attenuated with story height. The main frequency range of the vibration of the top floor of the building was 20-40 Hz, and the low frequency component tended to increase with the height of the building. Ballast mats had a good vibration mitigation effect on the over-track building with the increase of frequency. The maximum insertion loss of structures reached 7-12 dB in the frequency band above 40 Hz. The higher speed of the train, the smaller stiffness of ballast mats, the better the vibration mitigation effect of the ballast mats on over-track buildings would be. Compression deformation and vibration mitigation effect were considered. It was recommended that the stiffness range of ballast mats was 0.012-0.024 N/mm3.
Keywords:metro depot  ballast mat  over-track building  isolation effectiveness  
点击此处可从《浙江大学学报(工学版)》浏览原始摘要信息
点击此处可从《浙江大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号