海上风电筒型基础建造期风险分析研究
引用本文:侯鸽,蔡鸥,徐奎,练继建.海上风电筒型基础建造期风险分析研究[J].太阳能学报,2023,44(1):156-162.
作者姓名:侯鸽  蔡鸥  徐奎  练继建
作者单位:1.天津大学水利工程仿真与安全国家重点实验室,天津 300072;2.天津大学建筑工程学院,天津 300072;3.中国电建集团北京勘测设计研究院有限公司,北京 100024;4.河北工程大学水利水电学院,邯郸 056038
基金项目:河北省自然科学基金创新研究群体项目(E2020402074); 天津市自然科学基金(20JCQNJC01540); 国家自然科学基金创新研究群体科学基金(51621092); 高等学校学科创新引智计划(B14012)
摘    要:以中国某海上风电场筒型基础为研究对象,识别其建造期的风险源,并建立风险指标体系,然后基于改进的模糊故障树方法量化筒型基础建造期的整体风险发生概率,并与单桩基础结果进行对比。研究结果表明:筒型基础及单桩基础结构建造期的风险发生概率分别为3.21×10-3、9.47×10-3。依据DNV规范规定的失效频率等级可知,海上风电筒型基础及单桩基础结构建造期的风险等级均为高风险,但单桩基础的风险概率明显高于筒型基础,高约66.10%,筒型基础建造期的风险更低,工程实用性强。

关 键 词:海上风电机组  风险分析  故障树分析  筒型基础
收稿时间:2021-05-15

RESEARCH ON RISK ANALYSIS OF BUCKET FOUNDATION FOR OFFSHORE WIND TURBINE IN CONSTRUCTION PERIOD
Hou Ge,Cai Ou,Xu Kui,Lian Jijian.RESEARCH ON RISK ANALYSIS OF BUCKET FOUNDATION FOR OFFSHORE WIND TURBINE IN CONSTRUCTION PERIOD[J].Acta Energiae Solaris Sinica,2023,44(1):156-162.
Authors:Hou Ge  Cai Ou  Xu Kui  Lian Jijian
Affiliation:1. State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China;2. School of Civil Engineering, Tianjin University, Tianjin 300072, China;3. Power China Beijing Engineering Corporation Limited, Beijing 100024, China;4. School of Water Conservancy & Hydropower, Hebei University of Engineering, Handan 056038, China
Abstract:This study is to investigate the overall risk probability of the bucket foundation during the construction period. To achieve the above purpose, the risk sources were first identified. Then, the risk index system of the bucket foundation during the construction period was further constructed. Finally, an improved fuzzy fault tree analysis method was employed to quantify the overall risk probability of the bucket foundation and monopile foundation. The results obtained by the proposed method in this study show that the risk probability of the bucket foundation and monopile foundation is 3.21×10-3 and 9.47×10-3, respectively. According to DNV specification, both the risk probability of the bucket foundation and monopile foundation during the construction period falls into the high-risk level range, and the latter is 66.10 % higher than the bucket foundation. We can conclude that the bucket foundation is relatively safe during the construction period and has preferable engineering practicability.
Keywords:offshore wind turbines  risk analysis  fault tree analysis  bucket foundation  