白莲河抽水蓄能电站竖井开挖施工
引用本文:朱俊杰,李晓阳,王军,张伟朝.白莲河抽水蓄能电站竖井开挖施工[J].水利水电技术,2008,39(12).
作者姓名:朱俊杰  李晓阳  王军  张伟朝
作者单位:中国水利水电第一工程局有限公司,吉林,长春,130062
摘    要:白莲河抽水蓄能电站在引水系统共布置2座阻抗式调压井。竖井为高程233.100~319.000 m,总高度85.9 m。调压井井挖采用"先导井,后扩挖"的施工方法。施工中选择合理的爆破参数、出渣方法和及时的支护,保证了安全施工和开挖质量,取得了较好的经济效益。

关 键 词:竖井  爆破开挖  导井  白莲河抽水蓄能电站

Excavation of shaft for Bailianhe Pumped Storage Hydropower Station
ZHU Jun-jie,LI Xiao-yang,WANG Jun,ZHANG Wei-chao.Excavation of shaft for Bailianhe Pumped Storage Hydropower Station[J].Water Resources and Hydropower Engineering,2008,39(12).
Authors:ZHU Jun-jie  LI Xiao-yang  WANG Jun  ZHANG Wei-chao
Abstract:Within the water diversion system of Bailianhe Pumped Storage Hydropower Station,two restricted orifice surge shafts are arranged,of which the elevations are 233.100~319.000 m with the total height of 85.9 m..For the excavation of the shafts,the construction method of "excavating pilot shaft first,and then enlarging it" is adopted with reasonable blasting parameters and mucking method as well as instant supporting.Therefore,the excavation quality and safe construction are ensured with better economic benefit.
Keywords:shaft  excavation with blasting  pilot shaft  Bailianhe Pumped Storage Hydropower Station