长距离小半径曲线顶管工程施工监理
引用本文:陆忠发. 长距离小半径曲线顶管工程施工监理[J]. 中国市政工程, 2007, 0(1): 58-60
作者姓名:陆忠发
作者单位:上海合流工程监理有限公司,上海,200070
摘    要:上海污水治理二期的某项工程,是超出了现有常规顶管施工技术规程规范的规定而进行施工的项目。介绍了在工程监理中,抓住自动测量与人工测量相结合,顶力信息化监测,减摩效果动态管理等重点环节,是完成工程监理工作的成功经验。

关 键 词:污水处理  曲线顶管  监理措施  顶管技术标准
文章编号:1004-4655(2007)01-0058-03
收稿时间:2006-03-01
修稿时间:2006-03-01

Supervision on the Construction of Curve Pipe-jacking with Long Distance and Small Radius
LU Zhong-fa. Supervision on the Construction of Curve Pipe-jacking with Long Distance and Small Radius[J]. China Municipal Engineering, 2007, 0(1): 58-60
Authors:LU Zhong-fa
Abstract:A project of Shanghai Project Sewage Treatment II, the construction of which was above the existed standard of usual pipe-jacking construction technique rules. Several key processes of the project supervision were introduced such as combination of automatic survey and manual survey, information supervision on pipe-jacking stress and dynamic management on reducing friction and so on, which were regarded as the helpful experience about the project supervision.
Keywords:sewage treatment  curve pipe-jacking  supervision measures  pipe-jacking technique standard