绿色工业园区非传统水源利用设计
引用本文:赵芳,柴宏祥,罗勇,何强,颜文涛. 绿色工业园区非传统水源利用设计[J]. 南水北调与水利科技(中英文), 2012, 10(1): 68-71
作者姓名:赵芳  柴宏祥  罗勇  何强  颜文涛
作者单位:1. 重庆大学三峡库区生态环境教育部重点实验室,重庆,400045
2. 机械工业第三设计研究院,重庆,400039
基金项目:国家科技支撑计划课题(2011BAJ07B03)
摘    要:针对绿色工业园区非传统水源利用的特殊性,结合绿色工业园区水质、水量和空间利用等特点,以提高绿色工业园区非传统水源利用率为目标,介绍了重庆力帆摩托车生产基地绿色工业园区非传统水源利用设计的中水回用系统、雨水利用系统和非传统水源回用系统的总体思路和技术方案,并对该工程的水量平衡和经济技术指标做了详细分析,经核算,该工程的非传统水源利用率为36.0%,满足《绿色建筑评价标准》(GB/T 50378-2006)一般项的要求。

关 键 词:绿色工业园区  非传统水源利用  节水  雨水  中水  水量平衡  经济技术指标

A Case Study for Engineering Design Project on the Utilization of Non-traditional Water Resources in Green Industrial Parks
ZHAO Fang , CHAI Hong-xiang , LUO Yong , HE Qiang , YAN Wen-tao. A Case Study for Engineering Design Project on the Utilization of Non-traditional Water Resources in Green Industrial Parks[J]. South-to-North Water Transfers and Water Science & Technology, 2012, 10(1): 68-71
Authors:ZHAO Fang    CHAI Hong-xiang    LUO Yong    HE Qiang    YAN Wen-tao
Affiliation:1(1.Key Laboratory of the Three-Gorge Reservoir′s Eco-Environments,Ministry of Education,Chongqing University, Chongqing 400045,China;2.China Ctdi Engineering Corporation,Chongqing 400039,China)
Abstract:Utilization of the non-traditional water resources in the green industrial parks has its particularity.This paper presents a case study for engineering design project on the utilization of the non-traditional water resources in the green industrial parks of Lifan Motorcycle Production Base in Chongqing.The case study takes into account the characteristics of water quality,water quantity,and space usage in the green industrial parks,and the objective of the case study is to improve the utilization rates of the non-traditional water resources in the green industrial parks.In this paper,the general thought and technical scheme of the reusing system of the reclaimed water,the utilization system of rain water,and the reusing system of the non-traditional water resources for the case study are demonstrated.Furthermore,the detailed analysis of the water balance and economic and technical indexes of the project is discussed.The calculated utilization rate of the non-traditional water resources is 36.0% for the project,which meets the general requirements of "Evaluation standard for green building"(GB/T50378-2006).
Keywords:green industrial parks  utilization of non-traditional water resources  water conservation  rain water  reclaimed water  water balance  economic and technical indexes