首页 | 本学科首页   官方微博 | 高级检索  
     

官地水电站大坝碾压混凝土施工技术
引用本文:薛永亮.官地水电站大坝碾压混凝土施工技术[J].城市建筑,2014(30):262-262.
作者姓名:薛永亮
作者单位:雅砻江流域水电开发有限公司,成都610051
摘    要:官地水电站大坝最大坝高168 m。本文围绕碾压混凝土施工的施工布置、工艺方法及温控措施等方面,阐述了官地水电站大坝碾压混凝土施工的主要特点及采取的施工技术,希望能为其他类似工程提供借鉴及参考。

关 键 词:官地水电站  大坝  碾压混凝土  施工技术

Construction Technology of Roller Compacted Concrete of Guandi Hydropower Dam Station
Xue Yongliang.Construction Technology of Roller Compacted Concrete of Guandi Hydropower Dam Station[J].Urbanism and Architecture,2014(30):262-262.
Authors:Xue Yongliang
Affiliation:Xue Yongliang
Abstract:The largest dam of Guandi Hydropower Dam Stati-on is of 168 m. This paper from the construction layout, const-ruction process and temperature control measures, describes the main features and construction technology adopted compa-cted concrete of the rol er compacted concrete of Guandi Hy-dropower Station, hoping to provide reference and reference for other similar engineering.
Keywords:Guandi Hydropower station  dam  roller compacted concrete  construction technology
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号