首页 | 本学科首页   官方微博 | 高级检索  
     

沁北电厂二期工程给水泵配置方案的探讨
引用本文:刘发灿. 沁北电厂二期工程给水泵配置方案的探讨[J]. 河南电力, 2007, 35(1): 48-50
作者姓名:刘发灿
作者单位:河南华能沁北电厂工程部 河南济源454662
摘    要:针对沁北电厂二期600MW给水泵组选型,从给水泵台数、容量、启动备用泵配置及电动给水泵等方面进行技术经济比较,供相关人员探讨和商榷。

关 键 词:给水泵组  容量配置
文章编号:X(2007)01-048-03
修稿时间:2006-08-25

The Deliberation for the Disposing Plan of the Feed Water Pump of the Phase 2 Engineering Project of Qinbei Thermal Power Plant
Liu Fa-can. The Deliberation for the Disposing Plan of the Feed Water Pump of the Phase 2 Engineering Project of Qinbei Thermal Power Plant[J]. Henan Electric Power, 2007, 35(1): 48-50
Authors:Liu Fa-can
Affiliation:Henan Huaneng Qinbei Thermal Power Plant, Jiyuan 454662, China
Abstract:We have done the technical and economical comparison from the quantity of the water feed pump,capacity,the disposition of the starting spare pump,and motor-water-feed-pump about the sample of 600MW water feed pump group of the phase 2 engineering project of Qinbei Thermal Power Plant for discussion and deliberation for the concerned specialists.
Keywords:water feed pump group  capacity and disposition
本文献已被 CNKI 维普 等数据库收录!