虹桥枢纽迎宾三路隧道CX3段施工技术
引用本文:彭伟.虹桥枢纽迎宾三路隧道CX3段施工技术[J].中国市政工程,2010(5):46-47.
作者姓名:彭伟
作者单位:上海隧道工程股份有限公司,上海200082
摘    要:迎宾三路隧道工程为虹桥机场沟通东西航站楼两侧最直接、便捷的通道之一,规划中的轨道交通5号线正线隧道下穿暗埋CX3段。介绍了CX3节段的施工方案、施工技术及施工过程中发生的险情和处理措施,为今后的类似工程提供借鉴。

关 键 词:虹桥枢纽  隧道暗埋段  基坑施工技术  轨交下穿

On Construction Technique of CX3 Section of Yingbin Rd.(No. 3) Tunnel in Hongqiao Hub
PENG Wei.On Construction Technique of CX3 Section of Yingbin Rd.(No. 3) Tunnel in Hongqiao Hub[J].China Municipal Engineering,2010(5):46-47.
Authors:PENG Wei
Affiliation:PENG Wei (Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082, China)
Abstract:The tunnel of Yingbin Rd. (No.3) is one of the most rapid and convenient passages connecting the east and the west terminals of Hongqiao Airport. Planning Shanghai Metro Line 5 will be crossed by buried CX3 section. And the construction plan, technology, dangerous situation and treatment measures during the process are put forward, which can provide reference for the future similar projects.
Keywords:Hongqiao Hub  tunnel buried section  foundation pit construction technique  metro line underpassing