100m悬浇箱梁施工工艺的改进措施
引用本文:龚志刚. 100m悬浇箱梁施工工艺的改进措施[J]. 山西建筑, 2008, 34(22)
作者姓名:龚志刚
作者单位:湖南长沙华南交通工程咨询监理公司,湖南长沙,410000
摘    要:结合湖南省汉寿沅水大桥工程实例,介绍了100 m悬浇箱梁施工工艺的改进措施,提出了具体的施工步骤,以充分利用已有设备和材料,提高设备和材料的周转和利用率,从而达到加快施工进度和降低施工成本的目的。

关 键 词:悬浇箱梁  挂篮  施工工艺  改进措施

The improved measures of 100m suspending cast box beam construction technology
GONG Zhi-gang. The improved measures of 100m suspending cast box beam construction technology[J]. Shanxi Architecture, 2008, 34(22)
Authors:GONG Zhi-gang
Affiliation:GONG Zhi-gang
Abstract:Combined with the Hanshou Yuanshui Bridge engineering example,the improved measures of 100 m suspending cast box beam construction technology were introduced and the specific construction procedure was proposed so as to make full use of the existing equipments and materials and enhance the turnover and the availability of equipments and materials,which can accelerate construction progress and reduce the construction cost.
Keywords:suspending cast box beam  traveling carriage  construction technology  improved measures  