首页 | 本学科首页   官方微博 | 高级检索  
     

建(构)筑物下大条带协调式全采方法
引用本文:黄乐亭.建(构)筑物下大条带协调式全采方法[J].煤炭学报,1995,20(6):632-636.
作者姓名:黄乐亭
作者单位:煤炭科学研究总院唐山分院
摘    要:建筑物下大条带协调式全采方法是先采用大条带跳采,采后地表产生较小的(约30%)沉陷变形,而后仅用半数工作面即可联合开采剩余条带,最终实现全部开采,地表产生剩余的(70%)沉陷变形量。此方法具有条带法开采和多工作面联合开采的优点,又同时克服了它们的某些缺点,明显地减少了地表沉陷变形值和采动影响次数,是保护地面建(构)筑物十分有效的开采措施。

关 键 词:建筑物下  采煤  条带式开采  协调式全采法

TOTAL EXTRACTION OF SEAM UNDER SURFACE STRUCTURES WITH COORDINATED STRIP MINING METHOD
Huang Leting.TOTAL EXTRACTION OF SEAM UNDER SURFACE STRUCTURES WITH COORDINATED STRIP MINING METHOD[J].Journal of China Coal Society,1995,20(6):632-636.
Authors:Huang Leting
Abstract:The method involves mining of the coal seam under surface structures by alternate large strip partial extraction, slight subsidence deformation, about 30% takes place after mining. Following that the remaining pillars are extracted with only half the number of work faces used in the first phase of mining for full extraction of seam, allowing the surface to experience the remaining 70% of subsidence deformation. The mining method incorporates the merits of both partial extraction and multi-face working, while their respective weakness are accordingly offset. It proves to be an effective mining approach for protecting surface structures for drastic reduction of surface subsidence value and frequency of occurrence of mining-induced disturbances.
Keywords:mining under surface structures  total extraction with large strips in a coordinated manner  ground subsidence and deformation  multi-face mining
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号