三峡左岸电站VGS机组定子下线工艺
引用本文:杨运喜.三峡左岸电站VGS机组定子下线工艺[J].水电站机电技术,2004,27(2):29-31.
作者姓名:杨运喜
作者单位:水电八局机电制造安装分局,湖南长沙,410119
摘    要:三峡电站为目前国内最大水电站。发电机定子分瓣运到工地现场组装、叠片后在机坑内完成定子线棒嵌装、槽楔装配、电接头焊接、线棒端部绑扎、支持环安装绑扎、汇流铜环安装与焊接、水接头配制焊接与安装、绝缘盒安装、气密水压及流量试验、定子喷漆及整体耐压等定子下线的全部工作,并已成功地完成了3台机组的定子下线工作,填补了国内该项目的空白,为特大型水电站定子下线施工积累了宝贵的经验。

关 键 词:三峡左岸电站  VGS机组  定子下线  水接头  软管  纯水

Stator winding assembly technique of VGS sets for Three Gorges Left Powerhouse
Authors:Yang Yunxi The th Bureau of Water Conservancy and Hydraulic Power Engineering of China  Changsha  Hunan
Affiliation:Yang Yunxi The 8th Bureau of Water Conservancy and Hydraulic Power Engineering of China,Changsha,Hunan 410119
Abstract:Three Gorges Hydropower Station is the largest one in the world. The generator stator is transported to the construction site in segments and then assembled. After the core laminating, the stator winding assembly and test are finished. This has accumulated valuable experience for stator winding assembly of super-large generating sets.
Keywords:stator winding assembly  technique  experience