预应力混凝土斜拉桥箱梁剪力滞规律
引用本文:李艳凤,梁力,罗威力. 预应力混凝土斜拉桥箱梁剪力滞规律[J]. 沈阳工业大学学报, 2016, 38(6): 710-714. DOI: 10.7688/j.issn.1000-1646.2016.06.20
作者姓名:李艳凤  梁力  罗威力
作者单位:1. 沈阳建筑大学 交通工程学院, 沈阳 110168; 2. 东北大学 土木工程研究所, 沈阳 110004
基金项目:辽宁省教育厅科学研究一般计划项目(L2015442);沈阳建筑大学科研基金资助项目(20150500)
摘    要:为了揭示斜拉桥箱梁应力分布情况,对某单索面预应力混凝土斜拉桥箱梁沿纵桥向剪力滞效应的分布规律进行了研究.结果表明:单索面斜拉桥施工阶段不同的位置应采取不同的剪力滞系数进行平面杆系有限元分析,悬臂端索力作用点处该位置用轴力作用的剪力滞系数反映实际受力;索力之间的梁段在索力作用点处,根据弯矩轴力比确定的剪力滞系数反映实际受力;在索力作用点之间跨中的梁段,用弯矩作用的剪力滞系数反映实际受力,索力作用点与跨中之间的梁段,可采用线性插值求得截面剪力滞系数.

关 键 词:单索面  斜拉桥  预应力混凝土箱梁  空间分析  剪力滞效应  数值模拟  施工阶段  斜拉桥索力  

Law of shear lag effect in box girder of prestressed concrete cable-stayed bridge
LI Yan-feng,LIANG Li,LUO Wei-li. Law of shear lag effect in box girder of prestressed concrete cable-stayed bridge[J]. Journal of Shenyang University of Technology, 2016, 38(6): 710-714. DOI: 10.7688/j.issn.1000-1646.2016.06.20
Authors:LI Yan-feng  LIANG Li  LUO Wei-li
Affiliation:1. School of Transportation Engineering, Shenyang Jianzhu University, Shenyang 110168, China; 2. Institute of Civil Engineering, Northeastern University, Shenyang 110004, China
Abstract:In order to reveal the stress distribution in box girder of cable-stayed bridge, the distribution law of longitudinal shear lag effect in box girder of a certain prestressed concrete cable-stayed bridge with single cable plane was studied. The results show that different shear lag coefficients should be used for different sites to carry out the finite element analysis for the plane frame system at the construction stage of cable-stayed bridge with single cable plane. At the cable force action point in the cantilever end, the shear lag coefficient with the axial effect is used to reflect the actual force. At the cable force action point between the cable forces, the shear lag coefficient determined with the ratio of bending moment and axial force is used to reflect the actual force. At the girder section in the mid-span between the cable force action points, the shear lag coefficient determined with the bending moment is used to reflect the actual force. At the girder section between the cable force action points and mid-span, the shear lag coefficient can be obtained with the linear interpolation.
Keywords:single cable plane  cable-stayed bridge  box girder of prestressed concrete  spatial analysis  shear lag effect  numerical simulation  construction stage  cable force for cable-stayed bridge  