吕梁山隧道3号与4号斜井正洞通风方案
引用本文:谭世俊. 吕梁山隧道3号与4号斜井正洞通风方案[J]. 山西建筑, 2009, 35(9): 327-328
作者姓名:谭世俊
作者单位:中铁三局集团第四工程有限公司,北京,102300
摘    要:以吕梁山特长隧道3号,4号斜井正洞为例,根据长大斜井与正洞交叉的多工作面施工特点,结合计算方案,推算出通风机的数量及布置,并阐述了通风管理措施,从而积累了隧道施工经验,完善了通风方案。

关 键 词:特长隧道  斜井  正洞  隧道通风

Ventilation scheme of No.3 and No.4 inclined shaft entering straight tunnel of Lvliangshan tunnel
TAN Shi-jun. Ventilation scheme of No.3 and No.4 inclined shaft entering straight tunnel of Lvliangshan tunnel[J]. Shanxi Architecture, 2009, 35(9): 327-328
Authors:TAN Shi-jun
Affiliation:TAN Shi-jun
Abstract:Taken No.3 and No.4 inclined shafts entering straight tunnel of Lvliangshan super-long tunnel as examples ventilation scheme of those two shafts are calculated according to the characteristics of multi-working faces caused by crossing of long shaft with straight tunnel.Combined with calculation scheme the number and arrangement of ventilation machines are computed.In the end ventilation management measures are elaborated in order to provide references for tunnel construction and perfect ventilation scheme o...
Keywords:super long tunnel  inclined shaft  straight tunnel  tunnel ventilation  