玉龙喀什河山区中游河段水力发电规划综述
引用本文:邱海岭,马苏文.玉龙喀什河山区中游河段水力发电规划综述[J].电力学报,2011,26(4):343-345,356.
作者姓名:邱海岭  马苏文
作者单位:新疆水利水电勘测设计研究院,乌鲁木齐,830000
摘    要:概述了新疆玉龙喀什河中游段水能资源蕴藏、地形地质条件、工程占地移民情况及项目区交通条件的调查分析,对河段不同的梯级开发方案进行了研究,从梯级工程地质条件、水能指标、水工布置、施工条件、淹没及工程运行管理等方面选择推荐开发方案,在推荐方案的基础上通过分析论证,选择了该河段近期开发工程.

关 键 词:水力发电规划  开发方案  近期开发工程  中游河段

The Summary of the Hydroelectric Planning for the Middle Reach of Yulongkashi River
QIU Hai-ling,MA Su-wen.The Summary of the Hydroelectric Planning for the Middle Reach of Yulongkashi River[J].Journal of Electric Power,2011,26(4):343-345,356.
Authors:QIU Hai-ling  MA Su-wen
Affiliation:(Xinjiang Survey and Design Institute ofWater Resources and Hydropower,Urumqi 830000,China)
Abstract:According to the investigation and analysis on the hydroelectric potentiality, topographical and geological condition,emigrant in the occupied area and traffic conditions of middle reach of Yulongkashi River,the different cascade hydropower development programs have been researched.A reasonable program is recommended by comprehensive comparison from multiple criteria, which include engineering geology,hydraulic structure design,submerging,construction,operational guidance and economic indicator.By analyzing comprehensively the suggested design,cascade hydropower stations which are characterized by reliable technology and economic rationality are suggested to be developed in the near future.
Keywords:hydroelectric planning  development programs  project recently developed project  middle reach of river