某电站碾压混凝土坝体上游面涂刷处理措施
引用本文:胡和平,李焰. 某电站碾压混凝土坝体上游面涂刷处理措施[J]. 大坝与安全, 2010, 0(3): 62-66
作者姓名:胡和平  李焰
作者单位:葛洲坝集团第一有限公司,湖北,宜昌443002;葛洲坝集团试验检测有限公司,湖北,宜昌443002
摘    要:某电站碾压混凝土大坝蓄水后下游坝面、廊道内出现渗漏水现象,为确保大坝安全运行,采取多项措施联合处理。介绍涂料检验、涂刷试验及施工方法和效果,供参考。

关 键 词:涂刷  凯顿百森T1  碾压混凝土坝  水电站

Brush treatment for the upstream face at a roller compacted concrete dam
HU He-ping,LI Yan. Brush treatment for the upstream face at a roller compacted concrete dam[J]. Large Dam & Safety, 2010, 0(3): 62-66
Authors:HU He-ping  LI Yan
Affiliation:(China Gezhouba Group No.1 Engineering Co.,Ltd. )
Abstract:Seepage was found at the downstream face and gallery after impounding at a roller compacted concrete dam.For safe operation,counter-measures were carried out.This paper introduced the examination,test,construction and effect of brush,for reference.
Keywords:brush  Durab T1  roller compacted concrete dam  hydropower station