首页 | 本学科首页   官方微博 | 高级检索  
     

超大跨度混合梁斜拉桥施工控制
引用本文:王正林. 超大跨度混合梁斜拉桥施工控制[J]. 工程质量, 2014, 0(6): 69-72
作者姓名:王正林
作者单位:四川省资阳市若愚路桥建筑工程有限公司,四川资阳641300
摘    要:针对超大跨度混合梁斜拉桥建设面临的挑战,提出基于几何控制的全过程施工监控的观点,建立完善的施工监控体系,确保大桥建成后内力及线形满足理想状态要求。施工实践表明,实测数据与理论计算吻合很好,为同类桥梁监控提供参考。

关 键 词:斜拉桥  几何控制  施工监控  超大跨度

Construction Control of Super-Long-Span Hybrid Girder Cable-Stayed Bridge
Affiliation:WA NG Zhenglin (Sichuan Ziyang Ruoyu Highway and Bridge Construction Engineering Co., Ltd., Ziyang 641300, Sichuan, China)
Abstract:In view of the challenges for the construction of super-long-span hybrid girder cable-stayed bridge, a whole- procedure construction control based on geometry control method is proposed. In this study, a better construction control system is established, which can ensure the internal force and geometric profiles in completion stage to meet ideal requirement. Construction experience indicates that the theoretical calculation is in well accordance with the field results, which can provide a reference for the similar bridge construction control.
Keywords:Cable-stayed bridge  Geometry control method  Construction control  Super-long-span
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号