首页 | 本学科首页   官方微博 | 高级检索  
     


Algorithms for a two‐machine flowshop problem with jobs of two classes
Authors:BongJoo Jeong  Yeong‐Dae Kim  Sang‐Oh Shim
Abstract:We consider a problem of scheduling jobs of two classes of urgencies in a two‐machine flowshop with the objective of minimizing total tardiness of one class for urgent jobs and the maximum completion time of the other class for non‐urgent jobs. Urgent jobs are an important consideration in the real manufacturing systems, but it has not been studied due to the difficulty of the problem. In this research, a branch‐and‐bound (B&B) algorithm is proposed through developing lower bounds, dominance properties, and heuristic algorithms for obtaining an initial feasible solution. To evaluate the performance of the proposed algorithms, computational experiments on randomly generated instances are performed. Results of the experiments show that the suggested B&B algorithm can solve problems with up to 20 jobs in a reasonable amount of CPU time.
Keywords:scheduling  two‐machine flowshop  urgent job  multiple objectives  two‐agent
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号