首页 | 本学科首页   官方微博 | 高级检索  
     

应用沉降速率推算剩余沉降及卸载时间
引用本文:张长生,,张伯友,刘国楠,魏勇作.应用沉降速率推算剩余沉降及卸载时间[J].延边大学理工学报,2005,0(4):28-32.
作者姓名:张长生    张伯友  刘国楠  魏勇作
作者单位:1.中国科学院广州地球化学研究所,广州510640;2.中国科学院研究生院, 北京100039;3.铁道部科学研究院深圳研究设计院,广东深圳518034
摘    要:在地基处理工程中工后沉降和沉降速率是卸载的重要标准,次固结沉降可以估算在一定范围 内,工后沉降满足要求与否则主要由剩余主固结沉降控制。基于砂进固结理论和Asaoka方法可以推算 出在堆载预压任意时间的沉降速率,运用沉降速率和剩余主固结沉降的关系,就可以推算出任意时间的 主固结剩余沉降及卸载时间。在深圳—香港西部通道填海及地基处理工程中,此方法应用效果较好。

关 键 词:沉降速率  软粘土  地基处理  剩余沉降  工后沉降  卸载时间

Application of Settlement-Velocity to Calculate Residual Settlement and Unloading Time
ZHANG Chang-sheng,' target="_blank" rel="external">,ZHANG Bo-you,LIU Guo-nan,WEI Yong-zuo.Application of Settlement-Velocity to Calculate Residual Settlement and Unloading Time[J].Journal of Yanbian University (Natural Science),2005,0(4):28-32.
Authors:ZHANG Chang-sheng  " target="_blank">' target="_blank" rel="external">  ZHANG Bo-you  LIU Guo-nan  WEI Yong-zuo
Affiliation:1. Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640, China; 2. Graduate School, Chinese Academy of Sciences, Beijing 100039, China; 3. Shenzhen Branch, China Academy of Railway Sciences, Shenzhen 518034, Guangdong, China
Abstract:The settlement-velocity and post construction settlement including residual settlement and secondary consolidation settlement are very important unloading standard in foundation soil treatment project. The secondary consolidation settle- ment can be estimated within range, and the post construction settlement is mainly controlled by residual settlement. In Asaoka method, the settlement-velocity can be calculated in preloading anytime. By applying the relationship between settle- ment-velocity and residual settlement, the residual settlement and unloading time can also be computed. The relationship be- tween settlement-velocity’ s logarithm and preloading time is linearity, thus the unloading time can be confirmed by the graph. The method is very effective in Shenzhen-Hongkong West Passage fill seafront and foundation soil treatment project, and may have preferable application value.
Keywords:Settlement-velocity  soft clay  foundation soil treatment  residual settlement  post construction settlement  unloading time
点击此处可从《延边大学理工学报》浏览原始摘要信息
点击此处可从《延边大学理工学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号