首页 | 本学科首页   官方微博 | 高级检索  
     

三川河7号特大桥预应力T梁预制施工工艺
引用本文:许铁功.三川河7号特大桥预应力T梁预制施工工艺[J].山西建筑,2008,34(20).
作者姓名:许铁功
作者单位:山西路桥第二工程有限公司,山西,临汾,041051
摘    要:结合三川河7号特大桥预应力T梁施工实践,从T梁钢筋施工和T梁混凝土施工两方面介绍了40 m预应力T梁预制的具体施工工艺,为其他类似桥梁施工提供了参考。

关 键 词:预应力  施工工艺  钢筋  混凝土  模板

Construction technology for prefabrication of prestressed T-beam in No.7 super large bridge of Sanchuan river
XU Tie-gong.Construction technology for prefabrication of prestressed T-beam in No.7 super large bridge of Sanchuan river[J].Shanxi Architecture,2008,34(20).
Authors:XU Tie-gong
Affiliation:XU Tie-gong
Abstract:Combined with practice in prestressed T-beam construction of No.7 super large bridge of Sanchuan river,from reinforcement work and concrete construction of T-beam the construction technology for prefabrication of 40 m prestressed T-beam is introduced,which provide good references for the construction of similar works of bridge.
Keywords:prestress  construction technology  reinforcement  concrete  formwork
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号