某水电站地下厂房开挖过程中稳定性初步分析
引用本文:贾冬,邹国敬. 某水电站地下厂房开挖过程中稳定性初步分析[J]. 东北水利水电, 2011, 29(1): 5-8,71
作者姓名:贾冬  邹国敬
作者单位:华能西藏发电公司;
摘    要:西南地区某水电站地下厂房规模较大,最大跨度31.10 m,最大高度78.0 m,地质条件特殊,且属于高地应力区.开挖过程中,厂房上游边墙出现阶段性变形速率较快,且时间一位移曲线收敛不明显的现象.为确保厂房开挖的安全.本文主要从地质角度,结合类似工程,分析了厂房上游边墙是否存在不稳定块体,变形速率较快以及变形量较大的原因...

关 键 词:地下厂房开挖  变形原因  不稳定块体  支护措施  稳定性分析

Preliminary analysis of underground powerhouse stability during excavation phase for a certain hydropower station
JIA Dong,ZOU Guo-jing. Preliminary analysis of underground powerhouse stability during excavation phase for a certain hydropower station[J]. Water Resources & Hydropower of Northeast China, 2011, 29(1): 5-8,71
Authors:JIA Dong  ZOU Guo-jing
Affiliation:JIA Dong,ZOU Guo-jing
Abstract:The underground powerhouse of a certain hydropower station has larger scale with the largest span of 31.10 m and the maximum height of 78.0 m in southwest China.The geological conditions of underground powerhouse are special and belong to the high field stress areas.During the process of excavation,the upper boundary wall of the powerhouse appears some phenomenon that the rate of stage deformation is faster and the convergence of time-displacement curve is unobvious.Combined with similar projects,the paper ...
Keywords:excavation of underground powerhouse  deformation cause  unstable blocks  support measures  stability analysis  