首页 | 本学科首页   官方微博 | 高级检索  
     


Key concepts for Integrated Urban Water Management infrastructure planning: Lessons from Melbourne
Affiliation:1. RMIT University, Australia;2. GHD, Australia;3. Melbourne Water Corporation, Australia;1. University of South Florida, Department of Civil & Environmental Engineering, 4202 E. Fowler Avenue, ENB 118, Tampa, FL, 33620-5350, USA;2. City of Dunedin, Water Division/Reverse Osmosis Water Treatment Plant, P.O. Box 1348, Dunedin, FL 34697-1348, USA;3. DRIFT, Erasmus University Rotterdam, Social Sciences Faculty, Postbus 1738, 3000 DR Rotterdam, The Netherlands;1. Monash Infrastructure Research Institute, Department of Civil Engineering, 23 College Walk, Monash University Clayton, 3800, VIC, Australia;2. Monash Art Design and Architecture, Department of Architecture, Building F, Monash University, Caulfield East 3145, VIC, Australia;1. Department of Water Resource Development and Management, Indian Institute of Technology Roorkee, Roorkee 247 667 (UK), India;2. Department of Civil Engineering, Malaviya National Institute of Technology, Jaipur, Rajasthan, India;1. Faculty of Arts and Social Sciences, The University of Waikato, Hamilton, 3240, New Zealand;2. Cities Research Institute, Griffith University, Nathan, Brisbane, 4111, Australia;3. School of Chemical Engineering, University of Queensland, St. Lucia, Brisbane, Queensland, 4072, Australia;4. Cooperative Research Centre for Water Sensitive Cities, Monash University, Victoria, 3800, Australia
Abstract:“Integrated Urban Water Management plans” consider all water services simultaneously to determine optimal infrastructure solutions. They create many benefits, including unlocking opportunities for water reuse. This paper conducts preliminary assessment of nine IUWM plan case studies from Melbourne. It finds inconsistencies between plans in relation to environmental and liveability objectives, and option identification methods, and also that many IUWM options perform worse than conventional water supplies in regards to energy. The most consequential finding is that the plans do not include scenario planning and therefore fail to consider infrastructure performance regarding resilience to future uncertainties around population and climate change.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号