首页 | 本学科首页   官方微博 | 高级检索  
     

葛洲坝500 kV开关站构架改造
引用本文:覃鹏,魏永清. 葛洲坝500 kV开关站构架改造[J]. 电力建设, 2007, 28(9): 0-0
作者姓名:覃鹏  魏永清
作者单位:中国长江电力股份有限公司,湖北省,宜昌市,443002;中国长江电力股份有限公司,湖北省,宜昌市,443002
摘    要:原葛洲坝500 kV 开关站构架的安全稳定性不足, 存在安装质量缺陷, 成为开关站设备安全运行的重大隐患。经过对构架支柱的加固施工, 以及将构架横梁由箱形断面梁更换成三角形断面格构梁的改造工程, 彻底消除了葛洲坝500 kV 开关站构架的安全稳定性不足的隐患, 为开关站安全运行提供可靠的保证。

关 键 词:500kV开关站  构架  A型柱  横梁
文章编号:1000-7229(2007)09-0024-03
收稿时间:2010-01-25
修稿时间:2007-02-28

Gezhou Dam 500 kV Switching Station Truss Upgrade
QIN Peng,WEI Yong-qing. Gezhou Dam 500 kV Switching Station Truss Upgrade[J]. Electric Power Construction, 2007, 28(9): 0-0
Authors:QIN Peng  WEI Yong-qing
Affiliation:China Yangtze Power Co. Ltd., Yiehang 443002, China
Abstract:The original truss of Gezhou Dam 500 kV switching station has installation quality defects,resulting in instability problem and becoming serious hidden troubles to safe operation.Having strengthened original truss support column and replaced the original box girder with triangular lattice beam for the truss,the hidden troubles of insufficient truss stability are removed,ensuring switch station safe operation.
Keywords:500 kV switching station,truss,"  A"   column,girder
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力建设》浏览原始摘要信息
点击此处可从《电力建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号