首页 | 本学科首页   官方微博 | 高级检索  
     

考虑能源重复转换的综合能源系统经济运行
引用本文:冯麒铭,刘继春,杨阳方,谭心怡,尹龙,孙宁杰. 考虑能源重复转换的综合能源系统经济运行[J]. 电力建设, 2018, 39(12): 47-54. DOI: 10.3969/j.issn.1000-7229.2018.12.006
作者姓名:冯麒铭  刘继春  杨阳方  谭心怡  尹龙  孙宁杰
作者单位:1.四川大学电气信息学院,成都市 610065;2.西南交通大学电气工程学院,成都市 611756
基金项目:国家高技术研究发展计划(863计划)(2014AA051901)
摘    要:在综合能源系统中引入电转气(power to gas,P2G)设备加强了电力和天然气网络间的耦合,减少了弃风弃光现象,但也使可再生能源在进行优化调度时发生能源重复转换,降低用能效率,产生能源损耗。在此背景下,提出了一种减少能源重复转换的双层优化调度模型,引入KKT条件将双层模型转化为单层模型,优化得到了协调各转换设备的调度运行计划及系统最小运行成本。在算例中采用4种不同的典型场景对系统进行验证,结果表明:所提优化调度模型能够在提高可再生能源消纳的情况下,降低系统运行成本,提高用能效率,与未考虑能源重复转换的传统调度模型相比经济性有显著提高。

关 键 词:综合能源系统  能源集线器  优化调度  能源重复转换  双层优化  

Economic Operation of an Integrated Energy System Considering Repeated Conversion of Energy Sources Within an Energy Hub
FENG Qiming,LIU Jichun,YANG Yangfang,TAN Xinyi,YIN Long,SUN Ningjie. Economic Operation of an Integrated Energy System Considering Repeated Conversion of Energy Sources Within an Energy Hub[J]. Electric Power Construction, 2018, 39(12): 47-54. DOI: 10.3969/j.issn.1000-7229.2018.12.006
Authors:FENG Qiming  LIU Jichun  YANG Yangfang  TAN Xinyi  YIN Long  SUN Ningjie
Affiliation:1.School of Electrical Engineering and Information,Sichuan University,Chengdu 610065,China;2.School of Electrical Engineering,Southwest Jiaotong University, Chengdu 611756, China
Abstract:The introduction of P2G (power to gas) equipment into integrated energy systems has strengthened the coupling between electricity and natural gas networks, reduced the abandonment of wind power, but also reduced to a certain extent the optimization of renewable energy sources in energy hubs. Energy conversion occurs during dispatch, which reduces the energy efficiency and generates energy losses. In this context, a two-layer optimization scheduling model is proposed to reduce the repetitive conversion of energy sources. The KKT condition is used to convert the two-layer model into a single-layer model, and the scheduling operation schedule of the conversion equipment and the minimum operating cost of the system are optimized.Finally, four different typical scenarios are used to verify the system in the example. The results show that the proposed optimized scheduling model can reduce the operating cost of the system and improve the energy efficiency. The scheduling model that considers repeated energy conversions has significantly improved economics
Keywords:integrated energy system  energy hub  optimal dispatch  repeated energy conversion  two-layer optimization  
点击此处可从《电力建设》浏览原始摘要信息
点击此处可从《电力建设》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号