首页 | 本学科首页   官方微博 | 高级检索  
     

某工程屋面网架结构场外预拼装脚手架安拆方案
引用本文:牛长年.某工程屋面网架结构场外预拼装脚手架安拆方案[J].山西建筑,2014(20):129-130.
作者姓名:牛长年
作者单位:某陆航训练团,山西侯马043005
摘    要:结合工程实例,对某工程屋面网架结构场外预拼装脚手架安拆方案进行了研究,依据相关规范,简述了脚手架的搭设方式及材料要求,提出了脚手架搭设与拆除的安全技术措施,并对脚手架的受力情况作了验算,形成了一套完整的施工方案。

关 键 词:脚手架  预拼装  搭设  安全技术

Pre-assembly scaffold installation and dismantle scheme outside of the engineering roof grid structure
NIU Chang-nian.Pre-assembly scaffold installation and dismantle scheme outside of the engineering roof grid structure[J].Shanxi Architecture,2014(20):129-130.
Authors:NIU Chang-nian
Affiliation:NIU Chang-nian ( A Road Air Training Group, Houma 043005, China)
Abstract:Combining with engineering examples, the article studies the pre-assembly scaffold installation and dismantle scheme outside of the engineering roof grid structure, discusses the scaffold erection methods and material demands according to relevant norms, and puts forward safe- ty scaffold erection and dismantle technology measures, and examines its stress conditions, and finally forms a complete construction scheme.
Keywords:scaffold  pre-assembly  erection  safety technology
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号