某发电公司1号水轮发电机增容改造设计
引用本文:刘太洪.某发电公司1号水轮发电机增容改造设计[J].广东电力,2005,18(10):57-59.
作者姓名:刘太洪
作者单位:广东粤电枫树坝发电有限责任公司,广东,龙川,517300
摘    要:广东粤电枫树坝发电有限责任公司1号水轮发电机由于运行时间长,出现了铁心老化过热的现象,已不能满足水轮机增容改造后的出力要求,故决定对1号水轮发电机进行增容改造,将容量由80 MW增至100 MW.为此,对增容改造设计中几个关键点进行了阐述,改造后运行测试数据表明,发电机的改造是成功的.

关 键 词:水轮发电机  设计  改造
文章编号:1007-290X(2005)10-0057-03
修稿时间:2005年5月4日

Capacity-increasing transformation design for Unit 1 hydrogenerator of a power generation company
LIU Tai-hong.Capacity-increasing transformation design for Unit 1 hydrogenerator of a power generation company[J].Guangdong Electric Power,2005,18(10):57-59.
Authors:LIU Tai-hong
Abstract:The Unit 1 hydrogenerator of Guangdong Yudean Fengshuba Power Generation Co.,Ltd.experienced core aging and overheat due to long operation.Consequently,a capacity-increasing transformation on the hydrogenerator was conducted to raise its output from 80 MW to 100 MW.This paper expounds some key points in the capacity-increasing transformation design.Operation test data after the transformation show that the transformation is successful.
Keywords:hydrogenerator  design  transformation