桐子壕航电工程施工综述
引用本文:曹文.桐子壕航电工程施工综述[J].四川水力发电,2002,21(3):13-17.
作者姓名:曹文
作者单位:中国水利水电第五工程局,五分局,四川,成都,610066
摘    要:桐子壕航电工程自2000年9月开工以来,已历经一期一枯,一汛,一期二枯,到目前为止,完成混凝土浇筑量42万m^3,土石方开挖106万m^3,顺利完成二枯目标,安全进入了汛期施工,阐述了在施工中运用的新工艺及合理引进,采用的新材料新产品。

关 键 词:桐子壕航电工程  特细砂混凝土  截流戗堤  土石围堰
文章编号:1001-2184(2002)03-0013-05
修稿时间:2002年6月25日

Overview on Construction of Tongzihao Hydropower Station
CAO Wen.Overview on Construction of Tongzihao Hydropower Station[J].Sichuan Water Power,2002,21(3):13-17.
Authors:CAO Wen
Abstract:It took Chengdong hydropower station 43 months to be completed.In difficult concrete placing for powerhouse,construction design optimization was continuously carried out and new technology,new technique were developed,popularized and applied so as to speed up construction rate and successfully complete the project according to construction schedule.
Keywords:powerhouse concrete  gantry crane arrangement  layers and blocks  Chengdong hydropower station