A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process |
| |
Authors: | YU Sheng-ping PAN Quan-ke |
| |
Affiliation: | State Key Laboratory of Synthetical Automation for Process Industries, Northeastern University,Shenyang 110819, Liaoning, China |
| |
Abstract: | In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research methods are difficult to guarantee the accuracy of the model and successful application to actual applications. The rescheduling problem in response to operation time delay is firstly analyzed. This is then followed by the establishment of a novel multi-objective nonlinear programming model (MONPM). In specifications, a three-stage rescheduling method is proposed including the batches splitting (BS), forward scheduling method (FSM) and backward scheduling method (BSM). As a result, the real-time application shows that the proposed rescheduling method efficiently ensures the continuous casting and dramatically shortens the redundant waiting time for molten steel in very short rescheduling time. |
| |
Keywords: | SMCC rescheduling disturbance heuristic algorithm |
本文献已被 维普 万方数据 ScienceDirect 等数据库收录! |
| 点击此处可从《钢铁研究学报(英文版)》浏览原始摘要信息 |
|
点击此处可从《钢铁研究学报(英文版)》下载全文 |