首页 | 本学科首页   官方微博 | 高级检索  
     

柳钢中间包坝堰优化设计的计算机模拟与水力学模拟实验研究
引用本文:李义科,陈俊俊,任雁秋,李保卫,贺友多.柳钢中间包坝堰优化设计的计算机模拟与水力学模拟实验研究[J].包头钢铁学院学报,1999,18(4):414-417.
作者姓名:李义科  陈俊俊  任雁秋  李保卫  贺友多
作者单位:[1]包头钢铁学院环境工程系,内蒙古包头014010 [2]包头钢铁学院冶金工程研究所,内蒙古包头014010
摘    要:应用计算机数值模拟和水力学模拟实验对柳州钢铁厂连铸中间包坝堰进行了优化设计,其优化设计研究结果对柳钢连铸生产具有指导意义。

关 键 词:中间包  坝堰  计算机模拟  水力学模拟  优化设计  连铸

Study of optimizing design of dam and weir in tundish by hydraulic analogy and numerical analogy of computer
LI Yi-ke,CHEN Jun-jun,REN Yan-qiu,LI Bao-wei,HE You-duo.Study of optimizing design of dam and weir in tundish by hydraulic analogy and numerical analogy of computer[J].Journal of Baotou University of Iron and Steel Technology,1999,18(4):414-417.
Authors:LI Yi-ke  CHEN Jun-jun  REN Yan-qiu  LI Bao-wei  HE You-duo
Abstract:Applying the methods of hydraulic analogy and numerical analogy of computers,the design of dam and weir in tundish of continuous casting in Liuzhou Iron and Steel Factory is optimized. The results are able to guide the production of continuous casting.
Keywords:tundish  dam and weir  numerical analogy of computers  hydraulic analogy
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号