首页 | 本学科首页   官方微博 | 高级检索  
     

对口丁坝双岸整治对黄河下游河道冲淤的影响
引用本文:田世民,张防修,刘香君,韦诗涛,李东阳.对口丁坝双岸整治对黄河下游河道冲淤的影响[J].水利水电科技进展,2017,37(6):9-13.
作者姓名:田世民  张防修  刘香君  韦诗涛  李东阳
作者单位:黄河水利科学研究院水利部泥沙重点实验室, 河南 郑州 450003,黄河水利科学研究院水利部泥沙重点实验室, 河南 郑州 450003,河南省水利勘测设计研究有限公司, 河南 郑州 450008,黄河勘测规划设计有限公司, 河南 郑州 450003,河南黄河勘测设计研究院, 河南 郑州 450003
基金项目:国家自然科学基金重点项目(41330751);水利部公益性行业科研专项(201401002)
摘    要:选取低含沙水沙系列、枯水多沙水沙系列以及规划设计的未来50 a水沙系列,利用黄河下游一维水沙数学模型,模拟计算了对口丁坝双岸治理方案下黄河下游河道在3种水沙系列条件下的冲淤状况。结果表明,游荡性河段采用对口丁坝方案整治后,输沙能力得到了提高,该河段多输送的泥沙一半以上输送到利津以下,其余部分淤积在高村—利津河段,其中淤积以高村—艾山河段为主,艾山—利津河段的冲淤情况与现状相比变化不大。

关 键 词:对口丁坝  双岸整治  冲淤  黄河下游
收稿时间:2017/1/20 0:00:00

Impacts of counterpart spur dikes on river channel erosion and deposition in Lower Yellow River
TIAN Shimin,ZHANG Fangxiu,LIU Xiangjun,WEI Shitao and LI Dongyang.Impacts of counterpart spur dikes on river channel erosion and deposition in Lower Yellow River[J].Advances in Science and Technology of Water Resources,2017,37(6):9-13.
Authors:TIAN Shimin  ZHANG Fangxiu  LIU Xiangjun  WEI Shitao and LI Dongyang
Affiliation:Key Laboratory of Yellow River Sediment, MWR, Institute of Hydraulic Research, YRCC, Zhengzhou 450003, China,Key Laboratory of Yellow River Sediment, MWR, Institute of Hydraulic Research, YRCC, Zhengzhou 450003, China,Henan Water and Power Engineering Consulting Co., Ltd., Zhengzhou 450008, China,Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, China and Henan Yellow River Reconnaissance, Design and Research Institute, Zhengzhou 450003, China
Abstract:The governance strategies and regulation measures for the Yellow River have always been discussed for generations. In recent years, some researchers suggested controlling the wandering reach with the counterpart spur dikes in the Lower Yellow River to increase the sediment transport capacity. To study the effects of the counterpart spur dikes, three different kinds of runoff and sediment series were selected. The erosion and deposition situation in the Lower Yellow River was simulated by a 1-D numerical model. The results indicate that the sediment transport capacity of the wandering reach can be increased under the remediation of counterpart spur dikes. More than a half of the extra sediment from the wandering reach is transported to the downstream reach of Lijin station. The rest deposits between Gaocun and Lijin station, especially in the reach from Gaocun to Aishan station. The erosion and deposition situation between Aishan and Lijin station varies little before and after the construction of counterpart spur dikes.
Keywords:counterpart spur dikes  river regulation on both banks  erosion and deposition  Lower Yellow River
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水电科技进展》浏览原始摘要信息
点击此处可从《水利水电科技进展》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号