首页 | 本学科首页   官方微博 | 高级检索  
     

焦炉先立炉柱安装技术
引用本文:程爱民.焦炉先立炉柱安装技术[J].工业炉,2013(6):45-49.
作者姓名:程爱民
作者单位:五冶集团上海有限公司,上海201900
摘    要:宝钢焦炉升级改造工程中,新建一组两座55孔7m焦炉.基于宝钢原有焦炉为日本M型焦炉,采用了先立炉柱施工工艺,几十年生产运行证明,该工艺具有科学性和先进性,所以决定新建的焦炉采用先立炉柱工艺.结合7m焦炉护炉铁件结构特点,阐述先安炉柱的施工顺序、工艺和操作要领.

关 键 词:焦炉  炉柱  护炉铁件  临时拉条

Installation Technology of First Erected Buckstays of Coke Oven
CHENG Ai-min.Installation Technology of First Erected Buckstays of Coke Oven[J].Industrial Furnace,2013(6):45-49.
Authors:CHENG Ai-min
Affiliation:CHENG Ai-min ( MCC 5 Group Corporation Limited(Shanghai), Shanghai 201900, China)
Abstract:In the Baosteel coke oven upgrade project, a new group of 2x55 chambers 7 m coke oven were built. Because original Japanese M type coke oven used the first erected buekstays of coke oven construction process, and the production operation of several decades proved that the process is scientific and advanced, the technology of the first erected buckstays of coke oven was used in the new coke oven. Combining with the iron structure characteristics of the 7 m coke oven, the ,construction sequence, technology and operating essentials of the first erected buckstays of coke oven were elaborated.
Keywords:coke oven  buckstays of coke oven  iron parts for protection of coke oven  temporarytransversal bracing
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号