首页 | 本学科首页   官方微博 | 高级检索  
     

评估电网接纳风电调峰能力的优化方法
引用本文:胡泽春,韩子娇,张放,谢旭.评估电网接纳风电调峰能力的优化方法[J].电力系统自动化,2013,37(19):10-14.
作者姓名:胡泽春  韩子娇  张放  谢旭
作者单位:Department of Electrical Engineering,Tsinghua University,Beijing100084,China;Department of Electrical Engineering,Tsinghua University,Beijing100084,China;Department of Electrical Engineering,Tsinghua University,Beijing100084,China;North China Grid Company Limited,Beijing100053,China
摘    要:In the north part of China,the power outputs of many wind farms are limited by the load following capacity(LFC)of traditional generators.This paper proposes a mixed-integer programming formulation to assess the maximum LFC of a power system.The objective of the formulation is to maximize the total spare spinning capacity of all generators in the valley load period,which is subjected to constraints including power balance,unit on/off status and generator power limits at both peak and valley load levels.Based on the formulation,a method for evaluating wind power penetration limit is also introduced considering the error of the wind power prediction and the wind power curtailment.For given installed wind capacity,the annual wind power curtailment can be simulated.By presetting the maximum proportion of wind curtailment,the allowable wind power integration capacity is acquired by agolden section search method.The proposed method has been tested on a practical power system.Simulation results show the effectiveness of the method.

关 键 词:load  following  capacity  mixed-integer  programming  wind  curtailment  wind  power  penetration  limit
收稿时间:2013/5/17 0:00:00
修稿时间:2013/9/23 0:00:00

Optimization Method for Evaluating Wind Power Penetration Limit Constrained by Load Following Capacity
Zechun HU,Zijiao HAN,Fang ZHANG and Xu XIE.Optimization Method for Evaluating Wind Power Penetration Limit Constrained by Load Following Capacity[J].Automation of Electric Power Systems,2013,37(19):10-14.
Authors:Zechun HU  Zijiao HAN  Fang ZHANG and Xu XIE
Affiliation:Zechun HU;Zijiao HAN;Fang ZHANG;Xu XIE;Department of Electrical Engineering,Tsinghua University;North China Grid Company Limited;
Abstract:
Keywords:load following capacity  mixed-integer programming  wind curtailment  wind power penetration limit
本文献已被 CNKI 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号