罗河铁矿副井井筒主含水层探水注浆工程实践
引用本文:卢阶阶,陈政,朱林辉.罗河铁矿副井井筒主含水层探水注浆工程实践[J].江西煤炭科技,2010(2):85-87.
作者姓名:卢阶阶  陈政  朱林辉
作者单位:中鼎国际工程有限公司矿山隧道分公司,江西,南昌,330096
摘    要:罗河铁矿副井井筒施工至364.3 m深度时,遇厚度151.00 m的主含水层,涌水量超过66 m3/h,随着掘进深度的增加井筒涌水量逐渐增大。进行工作面预注浆后,涌水量小于3 m3/h。

关 键 词:井筒  涌水  探水  注浆  

Engineering Practice on Water Detection and Grouting in Auxiliary Shaft Main Aquifer in Luohe Iron Mine
Lu Jiejie,Chen Zheng,Zhu Linhui.Engineering Practice on Water Detection and Grouting in Auxiliary Shaft Main Aquifer in Luohe Iron Mine[J].Jiangxi Coal Science & Technology,2010(2):85-87.
Authors:Lu Jiejie  Chen Zheng  Zhu Linhui
Affiliation:Mine and Turnnel Branch/a>;Zhongding International Engineering Co./a>;Ltd./a>;Nanchang/a>;Jiangxi 330096
Abstract:Being in the construction of 364.3m-deep,auxiliary shaft in Louhe Iron Mine met main aquifer of 151.00m-thick,water inflow was over 66 m3/h and its water inflow continuously increased with the increased depth of excavation.The water inflow was below 3 m3/h after working face grouting.
Keywords:shaft  water inflow  water detection  grout  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号