首页 | 本学科首页   官方微博 | 高级检索  
     

煤矿建筑工程冬季期间施工方案
引用本文:李云霞.煤矿建筑工程冬季期间施工方案[J].山西建筑,2010,36(33):152-153.
作者姓名:李云霞
作者单位:山西兰花集团菖山煤矿有限公司,山西开城048002
摘    要:针对北方煤矿建筑工程冬季期间施工条件环境和工期安排的不利因素分析,从混凝土、钢筋和装饰装修工程三个主要方面提出了相应的防范措施,阐述了冬季期间的施工特点和施工方案,以保证冬季施工质量,保障工程顺利进行。

关 键 词:煤矿建筑工程  冬期  施工方案  技术措施

Discussion the winter construction scheme of coal mine construction engineering
LI Yun-xia.Discussion the winter construction scheme of coal mine construction engineering[J].Shanxi Architecture,2010,36(33):152-153.
Authors:LI Yun-xia
Abstract:In light of disadvantages of winter construction environment and construction schedule arrangement in northern coal mine construction engineering, this paper proposes corresponding preventive measures from three angles of concrete, steel, and decoration engineering, and ex- pounds winter construction features and scheme, so as to ensure winter construction quality and smooth engineering operation.
Keywords:coal mine construction engineering  winter  construction scheme  technical measures
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号